TechAni
Production Readiness Review

Greenlight (lite)

The definitive checklist for production readiness. 18 domains covering testing, chaos engineering, compliance controls, and on-call hygiene. Built on ITIL 4, TOGAF, NIST, and ISO standards.

Start a new review
140+Controls
16Domains
3Tiers
0Accounts needed

Tiered assessment

Controls filter to your criticality tier. Tier 1 critical services run the full 140+ item checklist. Tier 3 services run a strict subset.

Export anywhere

Generate raw Word and PDF summaries of your review. Attach directly to your change records or architecture boards as hard evidence.

Zero friction

No accounts. No server dependencies. State persists entirely in your local browser storage. Close the tab and resume without losing data.

What is covered

Testing readiness
Unit, integration, E2E, contract, white/black-box
Performance & load
SLO targets, stress, spike, soak testing
Reliability & SLOs
SLI definitions, error budget policy, MTTR baseline
Resilience patterns
Circuit breakers, bulkheads, fallbacks, retries
Chaos engineering
Pod kill, network partition, zone outage, CPU stress
Observability
RED/USE metrics, tracing, structured logs, alerting
Security
Auth, secrets, OWASP Top 10, container hardening
Infrastructure & CI/CD
Kubernetes probes, GitOps, progressive delivery, IaC
Data management
Migrations, backups, PII controls, erasure workflows
Governance
API catalog, ADRs, runbooks, CAB, change windows
Risk & compliance
SOC 2, GDPR, HIPAA, PCI, security scan results
Incident response
On-call rotation, SLA response times, post-mortems
Capacity planning
Traffic forecasts, headroom, DB growth, cost estimates
Accessibility & i18n
WCAG 2.1 AA, keyboard nav, locale-aware formatting
Feature flags
Kill switches, flag hygiene, config change audit trail

Ready to assess your service?

Requires 20 to 40 minutes for a Tier 1 service. Evidence links are optional on the first pass.

Start review